:: CLASSIFICATION: UNCLASSIFIED ::

MISSION-READY
GROUND CAPACITY

Modern large-, medium-, and small-aperture ground stations for cislunar/deep space comms, Space Domain Awareness, and high-reliability commercial links—inside a legally protected radio-quiet environment.

ZONENRQZ PROTECTED BACKHAUL100 Gbps CLASS STATUSONLINE MODELALLOCATION

> ENGINEER QUICKLOOK

Inputs Band plan (S/X/Ka), modem/backhaul requirements, security posture, contact schedule.
Outputs Contact supports, downlink delivery, telemetry routing, optional data products, rack/cage delivery.
Integration Customer-owned equipment welcome. Pad lease + utilities in place. Controlled-channel pathway available after initial routing.

Capacity is finite. Once prepared footprints are allocated, equivalent alternatives require new civil work and longer lead times.

REQUEST CAPACITY _ VIEW ASSET LIST
LIVE FEED // OPS
Operations floor
DATA FLOW: NOMINAL
:: MISSION PROFILES ::

WHAT THIS CAMPUS ENABLES

Buyers don’t need “a facility.” You need schedule certainty and physics-grade reliability. Freedom E Base is built for programs where outages, RFI, and construction delays become mission risk.

  • [01] DSN OFFLOAD CAPACITY
    Deep space and cislunar contact supports where demand scarcity drives value.
  • [02] SPACE DOMAIN AWARENESS (PASSIVE RF)
    Quiet-zone advantage for passive collection workflows and RF signature data products.
  • [03] GROUND STATION HOSTING (GSaaS)
    Pad, power, and pipe leasing for rapid constellation deployments.
  • [04] SECURE + NON-SECURE COMPUTE
    SCIF-ready pathway plus ample unclassified data center space for edge processing and commercial workloads.

> DECISION FILTER

If your program is threatened by any of the following, this site is a fit:

RISKFIBER LEAD-TIME RISKPOWER AVAILABILITY RISKRFI / NOISE FLOOR RISKACCREDITATION TIMELINE RISKCAPEX CONSTRAINT

This campus exists to remove those bottlenecks without a greenfield build.

:: CURRENT + PLANNED ::

ASSET INVENTORY

FEED // ANTENNA
Satellite antenna
RF: QUIET / STABLE
FEED // DATACENTER
Server racks
POWER: REDUNDANT
FEED // SPACE
Earth from space
LINK: READY

> CAPACITY SNAPSHOT (HIGH LEVEL)

This table stays intentionally high-level for public release. Detailed configuration is available under NDA and controlled channels.

Category What Exists Planned / Path
Large Aperture
Operational
2× 26-meter class antennas (structural integrity confirmed; operational maintenance posture)
DSN Offload
Feed upgrades to X/Ka band; modernization of control + sensing; phased delivery
Schedule Advantage
GSaaS Pads
Ready
19+ pre-poured foundations with power + communications trenches already run
Pad/Power/Pipe
Multi-tenant allocation model; customer brings antenna; rapid deployment sequencing
Finite Footprints
Backhaul
Available
Multiple fiber ingresses including telecom and education network pathways; designed for failover
High Throughput
Customer-specific routing, dedicated paths, cross-connect options (under agreement)
Compute (Secure)
SCIF-Ready Path
Hardened rooms, raised floor, substantial cooling and redundancy posture
Colocation
SCIF-as-a-Service posture: cage/rack offerings under accreditation pathway and customer requirements
Compute (Non-Secure)
Ample
Space for unclassified data center and edge compute workloads; dish adjacency with fiber potential
Commercial + Civil
Expansion by tenant needs: rack build-outs, hybrid architectures, edge processing for RF pipelines
Continuity
Designed
10,000 gallon elevated water tank; underground fuel tanks; 3 generators; multiple power feeds; hydro-fed availability
Survivability
Enhanced monitoring and maintenance cadence aligned to nuclear-grade protocols
:: ALLOCATION MODEL ::

BUILD-TO-SCALE, WITHOUT GREENFIELD DELAYS

> WHAT SCALES FAST

  • Pad Leasing (GSaaS): Customer deploys antenna; you avoid civil delays.
  • Unclassified Compute: Rack build-out + fiber adjacency for edge processing.
  • Contact Supports: Scheduled passes / mission support windows.

The constraint is not enthusiasm. The constraint is prepared footprints and operational calendar.

> WHY WAITING HURTS

Delay doesn’t preserve optionality. It transfers it to the next program in line. Allocated pads and calendar slots are hard to unwind inside government and prime procurement cycles.

SCARCITYFINITE PADS SCARCITYCALENDAR SLOTS REALITYNEW CIVIL WORK = TIME

Request capacity early to reserve the option, then align contracting and technical detail under controlled channels.

:: FEDERAL MISSION FIT ::

PROCUREMENT ADVANTAGE, WITHOUT THE THEATER

This campus is designed to be easy to buy. The goal is to reduce friction for PMs and contracting teams: clear scope boundaries, predictable deliverables, and clean compliance posture.

> CONTRACTABLE PACKAGES (EXAMPLES)

  • Contact Support Package: scheduled pass support + delivery requirements.
  • Pad Lease Package: foundation + utilities + fiber handoff (customer-owned antenna).
  • Colocation Package: rack/cage space + power + cooling + cross-connect.
  • Data Product Package: passive RF collection pipeline outputs (as authorized).

> PUBLIC-SAFE COMPLIANCE NOTICE

We keep public pages clean. Detailed technical configuration is handled under NDA and controlled channels.

POLICYNO CLASSIFIED POLICYNO ITAR POLICYNO EXPORT CTRL PATHCONTROLLED CHANNELS

Public content is informational only and does not constitute an offer. Final terms are governed by executed agreements.

:: REQUEST CAPACITY ALLOCATION ::

ROUTE ME TO THE RIGHT ENGINEER

Use this form to initiate a capability brief and get into the allocation queue. We will respond with next steps and move to controlled channels if needed.

EMAILNCoverstone@FreedomEBase.com RESPONSEFAST ROUTING NOTECAPACITY ALLOCATING

> IMPORTANT

Do not submit classified, ITAR, export-controlled, or proprietary sensitive details in this form. This form is for routing only. Secure channels are established after initial response.

Prefer email? Use NCoverstone@FreedomEBase.com with subject: Capacity Allocation Request.
:: LEGAL / OPERATIONAL ::

DISCLAIMERS

Informational Use Only. This page is provided for general informational purposes and does not constitute an offer to sell, lease, or provide services. Any engagement is subject to technical feasibility, regulatory compliance, availability, and executed written agreement.

Controlled Information. Do not transmit classified, ITAR, EAR/export-controlled, or other controlled unclassified information via this public page or unencrypted channels. Secure channels will be established as appropriate after initial contact and verification.

Trademarks & Affiliations. All trademarks referenced are the property of their respective owners. References to agencies or companies do not imply endorsement.